FROM DOORWAY TO FINAL POSITION

A place for the chamber.
A plan for the journey.

Start with your room, then work backwards through every opening, turn and change of level.

01

Measure the route.

Record door openings, corridors, corners, stairs and changes in level. Ask for packed dimensions and lifting requirements.

02

Make room for equipment.

The concentrator, compressor, dehumidification equipment and hoses need space too. Include access for operation and servicing.

03

Confirm the site.

Discuss floor loading, power, ventilation and the final equipment configuration before arranging delivery.

A PRELIMINARY FOOTPRINT CHECK

Put some numbers
around the idea.

Your allowance is a planning input, not a manufacturer clearance. This rectangle comparison does not check packed dimensions, doorway turns, height, equipment, lifting or floor loading.

LET’S MAKE IT PRACTICAL

Bring your measurements.
We’ll work through them.

Bring your room, your shortlist and your questions.

Talk to OxyRevo

OXYREVO / OFFICIAL FILMS

Space60 — delivery and assembly

See the chamber and its details in the manufacturer’s film. Equipment and finishes may differ from your selected configuration.

Space60 — delivery and assembly
OXYREVO HYPERBARIC / YOUTUBE

Space60 — delivery and assembly

Space60 — delivery and assemblyWatch on YouTube ↗